SHELTER BAY MOORING LOG SHEET
- 980824
- Unit is operating in the laboratory. Waiting for a ship.
-
- 980806
- Unit has been prepared and is ready to deploy. Operating in the laboratory.
- YSI SN: 325 (with new full scale range from factory)
- WetStar SN: 325
- Waiting for a new battery.980625
- Start the log sheet
-
- 980702
- Repeater 11 (BNL met tower) has ceased to operate, probably due to
lightning storms. Yesterday, when a reboot was attempted, the electrical
box failed which necessitated calling in electricians. The repeater was
repaired.
-
- Service visit to recover the buoy. download all stored data. Prepare
for deployment into the central area of Upper Westneck Bay.
-
- 980626
- Telemetry interrupted. Repeater 13 does not respond. suspect repeater
power failure, NOT loss of data.
-