Last Update: 960901
Jump to Failure summary:
Modifications to the Standard Data Logger
RAD LOGGER
MET LOGGER
Environmental Testing
Wiring check
- Measure all connector pins for shorts and continuity.
- Measure thermopile resistance.
Sensitivity
- Measure output under bright light. This is not a calibration test.
Hot Test (with cold water douse)
- Put sensors in the environmental chamber under a fixed light.
- Bring temperature to 60 C and hold for >12 hrs.
- Remove sensors from chamber and spray with room temperature water
spray to simulate a heavy rainfall.
- Return unit to the environmental chamber.
Cold Test
- Rapidly cool chamber to < -40 C.
- Leave units in the chamber for >12 hrs.
- Remove from the chamber and allow to warm to room temperature.
Final Items
- Complete the test form. Record calibrations and serial numbers as
needed.
- Fill out the routing sheet.
- Send each sensor with routing sheet to the calibration site
(NREL).
- Send a copy of all paper work to TWPPO.
- File original test procedures and all associated paperwork at BNL.
FAILURE SUMMARY
- DL s/n 035 cold-hot failure 8/96
- Configuration Software/Calibration Error - 8/96
Current Configuration Software:
SKY960820 -- Derived from the earlier
ARCS-1 version 951025.00.
Radiometer Channels
The radiometer channels are the most critical to the measurement. Accuracies
of 0.1% are expected with full-scale input 10 mv for the PSP and 1 mv for
the PIR sensors. This translates to input signals of 10 microvolts and 1
microvolt respectively. There are many places where these signals can be
corrupted.
NOTE: The current SKY configuration software (v204) for the ZENO
data loggers exhibits excellent calibration stability. The configuration
testing is described in (DL TEST)