P11 INSTRUMENT HISTORY
 
PRP   INSTRUMENTS    SOAR   SOAROPS
 
3/13/2002

 
2002-03-15
PRP11 assembly is completed. The instrument was put imside to new Hardigg shipping cases and picked up by JET SPEED Shipping. This is the first unit that was anodized and then painted. Acer computer was shipped while we bring the Toshiba up to speed.

2003-05-08
Received at BNL for calibration and maintenance.