P07 INSTRUMENT HISTORY
 
PRP   INSTRUMENTS    SOAR   SOAROPS

2000-4-21-28 (112-119)
P07 was built for JAMSTEC and delivered to Japan. Installed on the Mirai.
2000-5-19 (139)
FRSR motor fails. No FRSR data after day 139.
2000-4-29 (120)
Start MR-00-K3, test leg to Yoksuka
2000-4-30 (121)
Yoksuka day stop
2000-5-19 (139)
frsr stops operating. Motor?
2000-6-10 (162)
End cruise MR-00-K3
2000-6-12 (164)
Start MR-00-K4
2000-7-5 (187)
End MR-00-K4
2000-7-6 (188)
Start MR-00-K5
2000-7-13 (195)
PRPRX software stops. PC needs reboot. FRSR motor replaced.
2000-8-1 (214)
End MR-00-K5
2000-8-4 (217)
Start MR-00-K6
2000-8-10 (223)
PRP locks up. Bad weather prevents climbing the tower to reset. The problem was found to be a leaking power cable. It was pinched apparently.
2000-8-20 (233)
Seattle port. BNL makes repairs and recalibrates.
2000-9-6 (250)
Motor wire pinched between cap plate and motor housing. Apparently this was done in Seattle and only failed now. The wire was repaired the next day.
2000-9-27 (271)
Shadowband was broken off and lost in heavy weather.
2000-10-11 (285)
PRP stalls. Replace FRSR motor cable. Reset.
2000-10-13 (287)
Replace missing shadowband
2000-10-16 (290)
End MR-00-K6
2000-10-17 (291)
Start MR-00-K7
2000-11-8 (313)
Reported problems with PSP/PIR preamp.
2000-11-13 (318)
BNL ships new preamp by next-day air
2000-12-7 (342)
FRSR motor shaft was loose. Re-tightened.
2000-12-10 (345)
Loose shaft on FRSR shadowband.
2000-12-19 (354)
Yoksuka, End MR-00-K7
2001-04-13
Deployed on Mt. Lemmon for one week.

2002-06-28
Received from JAMSTEC for calibration and refinishing of painted surfaces.
2002-09-25
Shipment made to Jetspeed Air Cargo who will ship it back to JAMSTEC.