2001-10-12
Install P02 on the Ka'imimoana. (PrpCal_01_0007)
2000-10-14
Ka'imimoana departs Honolulu. Begin KA-00-08
2000-11-14
KA arrive Kwajalein. end KA-00-08.
2000-11-16
KA departs Kwajalein. Begin KA-00-09 to service 165E and 180E.
2000-12-12
Arrive Honolu for Christmas port, 24 days. Equipment stowed.
2001-1-7
SS re-installs P02. New Acer laptop. New PNI for tilt.
2001-1-8
KA departs Honolulu. Begin KA-01-01 short round-island cruise. SE on board.
Preamp fails; water in box.
2001-1-10
End KA-01-01. Replace preamp. (Note: this pre-amp is un calibrated.)
2001-1-13
KA departs Honolulu. Begin KA-01-02 to service 140W and 125 W.
2001-2-14
KA arrives San Diego. Ship P02 to BNL.
2001-4-2
Re calibrate P02 (PrpCal_02_0101, use this cal for KA-01-02.)
2001-4-13
Begin Mt. Lemmon calibration (Begin mle01p02)
2001-5-3
end mle01p02. Transport to San Diego.
2001-5-5
Install P02 onto Ka'imimoana. Check out all.
2002-1-20
Calibrated the DL board. Changed shaft orings, and motor case cover to a cover with the "D" shaped hole. Sent head #432 to YES for calibration.
2002-2-4
Received calibrated head #432 from YES. Insulated and installed on PRP02.
2002-2-12
Preparation for 2002 Kaimimoana Season: PRP02 CALID = 0202
Head 432, calid = 0201
Data Logger dl00_4, calid = 0104
PSP 32385F3, calid = 0202
PIR 32387F3, calid = 0202, Temperature calid = 0202
2002-8-7
CDU returned because of a chip failure. Chip supplied power to amps for the analog channels of the RSR.
Spot checked all channels for calibration.
Put of roof in place of P01 CDU to verify operation of other functions.
Repaired battery box and returned.
Shipped back to the Kai at Hickam AFB for 8/13 departure from Honolulu.
2003-2-19
Recovered from the KAI on 2/19/03.
NO DATA collected since early May.